Oplate Šitum
+385 99 33 44 997 Request a Quote
Home / EU project
Financira Europska unija – NextGenerationEU The project is co-financed by the National Recovery and Resilience Plan 2021-2026.

Project „The Transition of the Oplate Šitum Society to an Energy and Resource-Efficient Economy”

Reference code of the Grant Agreement
NPOO.C1.1.1.R4-I1.01.0076
User
OPLATE ŠITUM d.o.o. for the production of metal structures and their parts, Ćubića put 12, 21256 Cista Provo; OIB: 49660480498
Period of project implementation
The project is being implemented from October 1, 2023 to January 31, 2026.
Total value of the project712,988.86 EUR
Total eligible costs277,658.05 EUR
Amount of co-financing from the European Union202,884.94 EUR

Brief description of the project

The project objective is to invest in an energy and resource-efficient economy through investments in energy renovation of the economic entity, increasing the use of renewable energy sources with the aim of reducing emissions, and investing in the introduction of resource efficiency in the production cycle and the life cycle of products, including sustainable supply of primary and secondary raw materials. The project „The Transition of the Oplate Šitum Society to an Energy and Resource Efficient Economy“ includes the construction of a photovoltaic power plant, the installation of a heat pump, and the purchase of energy-efficient equipment to reduce energy consumption, increase the use of renewable sources, and improve the ecological sustainability of the production process. By implementing the investments, the company achieves a significant reduction in CO₂ emissions, an increase in the share of secondary raw materials, and almost complete energy independence, thereby directly contributing to the green transition and the circular economy goals.

General objective of the project

Encouraging productive investments by SMEs from energy-intensive industries with the aim of achieving a more energy and resource-efficient economy through the promotion of a circular economy by introducing resource efficiency into the production cycle and product life cycle, including sustainable supply of primary and secondary raw materials, increasing the use of renewable energy sources and reducing emissions.

Purpose of the project (specific objectives)

  1. Adapting the Oplate Šitum company to current and future environmental requirements through investment in the company's green transition (Built-in additional operational capacity for energy from renewable sources 0.05 MW)
  2. Oplate Šitum's investment in the green transition with the aim of reducing negative impacts on the climate and the environment, increasing the sustainability of production, preserving existing and creating new jobs, and strengthening local and regional competitiveness:
    78,195 MWh/yearQuantity of renewable energy in gross final energy consumption
    161,48644 MWh/yearSavings in annual primary energy consumption
    34,48778 t/yearThe amount of greenhouse gas emission reduction through the reduction of CO₂ emissions
    50%The share of primary raw materials replaced by secondary raw materials (recycled) or reused raw materials
    10Opening of new jobs

Expected results of the project

The expected result of the project is to increase the energy and resource efficiency of the company's operations through the use of renewable energy sources, reduce CO₂ emissions, reduce waste in production, and strengthen production capacity and open up new job opportunities.